Client: EMP Bentu Ltd.
Period: 2018 – 2021, 2021 – 2024, 2024 – 2027
Location: Riau, Indonesia
Status: On Going
Project Overview
From the Seng Segat Gas Plant, gas is transferred to the delivery point at the Seng Segat Delivery Station (SSDS) via the trunkline (underground transmission pipeline) using a 12-inch diameter transmission pipeline with an estimated length of 17,000 meters, connected to the piping and instrumentation system and including a manifold.





