Client: Consortium of PT Bina Rasano Engineering
Period: 2018
Location: East Kalimantan, Indonesia
Status: Completed
Project Overview
The Sambera Gas Power Plant (PLTG) with a capacity of 2×20 MW replaced its fuel from High-Speed Diesel (HSD) oil to LNG, resulting in savings of 38 percent with a potential fuel cost efficiency of IDR 280 billion a year.