Rental Services for Gas Processing Facility 60 MMSCFD – PT Pema Global Energi

Client: PT Pema Global Energi
Period: 2023 – 2031
Location: North Aceh, Indonesia
Status: On Going

Project Overview

PT Pema Global Energi intends to increase the gas delivery capacity from the Arun and SLS Fields through the provision and operation of the Gas Booster Compressor Phase-2 Package. This project includes Engineering, Procurement, Construction, Installation & Commissioning (EPCIC) works as well as Operation & Maintenance (O&M) services throughout the rental period.

Service

Our Services

Interested in a similar project? Our team is ready to discuss your scope, schedule and requirements.

Discuss a Similar Project →
Explore this service →← Back to all projects

Project Gallery

On-Site Documentation

EPCIC
Onshore and offshore construction repair and modification works for Pertamina Hulu Mahakam.
Operation & Maintenance
Operation and maintenance of four gas compressor trains at the Simenggaris facility.
EPCIC
Integrated engineering and construction services for the Gas Processing Facility in the Simenggaris Block.
Operation & Maintenance
Routine monitoring, inspection and maintenance of the pipeline route in Medco E&P Indonesia Rimau Field.
EPCIC
Replacement of the Melibur export and incoming pipelines (approx. 2.5 km and 5 km), including hot tapping tie-ins.
EPCIC
Temporary loading facility at Jetty Sulfur to transfer diesel to ships, completed within 60 days for the RDMP Balikpapan project.
Operation & Maintenance
Relocation and overhaul of two gas compressor packages with a total capacity of 15 MMSCFD in Simenggaris.
EPCIC
EPCI of production facilities at the MSAI & MSTB Plant, Kepulauan Meranti, to increase production capacity.
Gas Compressor Package Supply & Rental
Rental of three gas booster compressor packages with a total capacity of 45 MMSCFD at Cluster IV.
Manpower Services
Drilling and Workover Personnel Services for PT Energi Mega Persada Tbk (2023 – 2024).
Manpower Services
Field Personnel Support Services for PT Energi Mega Persada Tbk (2023 – 2025).
Manpower Services
Department Personnel Services for Kangean Energy Indonesia Ltd. (2023 – 2025).
Manpower Services
Procurement, Inventory, Transportation, Commercial & Legal Personnel Services for Kangean Energy Indonesia Ltd. (2023 – 2025).
Manpower Services
Provision of Support Personnel Services for Jakarta Office for PT Energi Mega Persada Tbk (2022 – 2024).
Operation & Maintenance
Supporting work equipment and maintenance services for the Dieng & Patuha Unit 2 geothermal development.
EPCIC
Engineering, procurement and construction of geothermal surface facilities for the Dieng I Development Project.
Manpower Services
Provision of Operation Support Services for Premier Oil Natuna Sea B.V. (2020 – 2022).
Gas Compressor Package Supply & Rental
Rental of a 12-inch, approximately 17 km underground gas transmission trunkline from Seng Segat Gas Plant to the delivery station.
Gas Compressor Package Supply & Rental
Rental of four gas booster compressor packages with a total capacity of 60 MMSCFD for EMP Bentu, Riau.
EPCIC
LNG storage and regasification facility for the 2×20 MW Sambera Gas Power Plant (PLTG), East Kalimantan.
Manpower Services
Provision of Support Labor Services for Medco E&P Indonesia (2017 – 2019).
Manpower Services
Provision of Integrated Well Services for Platform Campaigns for Eni Indonesia (2017 – 2018).
Manpower Services
Operational Support Manpower Services for Husky-CNOOC Madura Limited (2016 – 2018).
Manpower Services
Drilling Personnel Consultancy Services for Medco E&P Indonesia (2015 – 2017).

Let's Work Together

Have a Similar Project in Mind?

Share your scope and timeline — our team will get back to you with the right approach.

Together for a
Stronger Indonesia