Client: EMP (PT Energi Mega Persada Tbk)
Period: 2023 – 2026
Location: Riau, Indonesia
Status: On Going
Project Overview
The MSAI & MSTB Plant is located in Desa Tanjung, Kecamatan Tebing Tinggi Barat, Kabupaten Kepulauan Meranti, Riau. A production facility is planned to be built at the MSAI & MSTB Plant to increase production capacity. This capacity expansion will be achieved through a drilling program, targeting an additional 4,500 BFPD from the MSTB Field and 4,000 BFPD from the Ringgit Field.




